您现在的位置:澳门金沙91599.com>> 工程业绩>> 水电枢纽>>正文内容

修山水电站


点击数: 【字体: 收藏 打印文章
 
 
省优秀澳门金沙城娱乐手机版一等奖
同类规模水电站中设计与建设周期最短
    修山水电站位于湖南省桃江县境内资水干流下游,是一个以发电为主的中型综合性水电工程。2004年开工,2006年建成。水库总库容1.59亿m3。砼闸坝,坝高25.5m。低水头径流式电站,河床式厂房,装机容量65MW(5×13MW)。灯泡贯流式水轮发电机组,水轮机转轮直径6.25m,最大水头8.2m,额定水头5.1m,最小水头3.2m。
 
Xiushan Hydropower Station
First Prize of Provincial Excellent Engineering Consultation 
It has the shortest design and construction cycle in similar scale hydropower stations. 
Xiushan Hydropower Station is located at downstream of Zishui main stream within Taojiang County of Hunan Province. It is a medium-sized comprehensive power project, mainly engaged in power generation. Construction of the Project started in 2004 and accomplished in 2006. The total storage capacity is 159million m3. It is built with concrete gate dam with crest height 25.5m, low-head runoff power station, powerhouse in river channel, bulb type turbine and generator units, with installed capacity of 65MW(5×13MW) and runner diameter of 6.25m. The bulb type unit has maximum water head of 8.2m, rated water head of 5.1m, minimum water head of 3.2m.
 

分享到: 微信 澳门金沙城娱乐手机版

编辑: 来源: 发布时间:2014年08月12日
上一篇:白云水电站[ 08-12 ]下一篇:浯溪水电站[ 08-12 ]
相关信息
没有相关内容
XML 地图 | Sitemap 地图